Bo Pugh
|
|
« on: October 17, 2012, 07:38:45 pm » |
|
i wont be able to run it underground because their on a cement slab. and from the spicket i have now its about 10 foot from the first kennel and i guess about a 4 foot rise to the top of the kennels where i will have to run my water header. and about 35 foot to the end. i have some jags so im sure they will be swinging off the pipe and demolish and kind of insulation the first day haha. but i think if i run it where it will stay drained in the water bowls and not stay in the pipe it should be good from freezing, i will probably end up putting a cap on the line with a small hole drilled to keep pressure all way around. i would like to do the lixit for dogs but it freezes here in the winter and probably stay froze up. but i got several good ideas in my head now from everyone and going to start on it friday and just do some adjusting according to the dog behavior. thanks
|
|
|
Logged
|
|
|
|
|