jmo i would use a couple of 55 gal barrels w/lids rigged in line and plumb clean outs in them ,,, just split a coupling in half to hold the clean out stack on and the inlets and outlets then run 5-10 feet to your drain field t off to the two lines or pit after that id run two perferated lines out 40 feet or so... keeping the drain lines some what level as you would in a house system block it up level with a 2x4 or 2x6 so that rock can get under it and put about 6 inches of rock over it then you can cover it with a good layer of have or get you some of that paper made for septic systems (i forget its name) then cove with dirt making sure is a sandy type of soild and hump it so as no water will pool up,,,,, you should be good to go Dexter
|
|
|