Author Topic: Concrete.... What did I do wrong?  (Read 2280 times)
DoGgONit
Alpha Dog
*****
Offline Offline

Posts: 686


423# scored 789.25 W.W.T.wieght class


View Profile
« Reply #20 on: July 01, 2011, 04:23:27 pm »

i came up with .855 cu.yds


     18"x123"x3"=6,642"
     30"x288"x3"=15,552"
     48"x123"x3"=17,712"

     6642+15552+17712=39,906"

    39,906"divided by 1,728"= 23.09375 '  

    23.09375 'divided by 27'=.8553 cu yards

 please feel free to correct me but i used a calculator! im prolly still wrong!
« Last Edit: July 01, 2011, 04:36:04 pm by DoGONit » Logged

Eric Edwards (512)-673-0843
email:  scumgenocide@yahoo.com
LIVIN THE DREAM!!
Hog Dog Mike
Strike Dog
****
Offline Offline

Posts: 486


View Profile
« Reply #21 on: July 01, 2011, 07:03:31 pm »

I poured 5 runs that were 4' x 20'x 4" deep. It figures out real close to 1 yard and I used the cart. Each time they were supposed to be long yards. Also I had wire and plastic on top of my sand. I barely had enough each pour and that is not taking into account that the sand base made the thickness less than 4".

They might short you but it is not going to go over if you use the cart. I just had a foundation poured for a shop. It was 30'x40' with a 12'x40' lean to on the side. They brought 3 trucks and had a little left over which made me a nice ramp.
Logged
buddybegone
Alpha Dog
*****
Offline Offline

Posts: 598



View Profile
« Reply #22 on: July 01, 2011, 09:47:34 pm »

length times width times depth divided by 27 will give you cubic yards 1.2832 yds + 10% = 1.4115 if i didnt miss read something lol
« Last Edit: July 01, 2011, 09:55:38 pm by buddybegone » Logged
coyote hunter
Boar Slayer
*******
Offline Offline

Posts: 1163


View Profile
« Reply #23 on: July 02, 2011, 02:55:25 am »

Looks Like u poured a footing first. Add the slab to the footing And ud b rite.
Logged

bay tight, catch hard
jml
Catch Dog
***
Offline Offline

Posts: 210


View Profile
« Reply #24 on: July 03, 2011, 09:30:19 am »

If I had your money I would have paid someone to do all of it for me Wink